null

Lambda To CAN - Dual (LTCD) Long Lead

SKU:
MOT61301L
$1,046.47 ($1,203.44) Excl. GST (Incl. GST)
Unit of Measure:
each
Purchase Increment:
1
Minimum Purchase:
1 unit
We ship worldwide at competitive pricing. Shipping calculated at checkout.

Description

Motec Dual Lambda To CAN (LTCD) long lead for use with Bosch 4.9 sensors.

Connects to any Motec CAN compatible product through CAN-bus.

Please note that a lambda sensor is not included with this price.

 

Accessories (sold separately)

View AllClose