MoTeC Lambda To CAN (LTC) Long Lead
SKU: MOT61300L

MoTeC Lambda To CAN (LTC) Long Lead
SKU: MOT61300L
Summary:
Connects to any MoTeC CAN compatible product through CAN-bus. Please note that a lambda sensor is not included with this price. Accessories (Sold Separately).
Excl. GST (Incl. GST)
$766.91 ($881.95)
Description:
MoTeC Lambda To CAN (LTC) Long Lead
- for use with Bosch 4.9 sensors.
- Connects to any MoTeC CAN compatible product through CAN-bus.
- Note: that a lambda sensor is not included with this price.
Accessories (Sold Separately)
- Genuine Bosch LSU 4.9 Lambda Sensor with 500mm lead click here.
- Genuine Bosch LSU 4.9 Lambda Sensor with long 850mm lead click here.
- Deutsch DTM 4-Way Plug Kit click here.
- Mild Steel Bung and Plug Kit click here.
- Stainless Steel Lambda Bung and Plug Kit click here.
