Lambda To CAN - Dual (LTCD) Long Lead
SKU: MOT61301L

Lambda To CAN - Dual (LTCD) Long Lead
SKU: MOT61301L
Summary:
Motec Dual Lambda To CAN (LTCD) long lead for use with Bosch 4.9 sensors. Connects to any Motec CAN compatible product through CAN-bus. Please note that a lambda sensor is not included with this price. Accessories (sold separately) Genuine Bosch LSU 4.9 Lambda Sensor with 500mm lead click here. Genu…
Description:
Motec Dual Lambda To CAN (LTCD) long lead for use with Bosch 4.9 sensors.
Connects to any Motec CAN compatible product through CAN-bus.
Please note that a lambda sensor is not included with this price.
Accessories (sold separately)
- Genuine Bosch LSU 4.9 Lambda Sensor with 500mm lead click here.
- Genuine Bosch LSU 4.9 Lambda Sensor with long 850mm lead click here.
- Deutsch DTM 4-Way Plug Kit click here.
- Mild Steel Bung and Plug Kit click here.
- Stainless Steel Lambda Bung and Plug Kit click here.
